Teacom is honored and proud to be awarded the contract to supply, design and install the Busway LI Aluminum busbar system for the VHG01 Factory Project - Chau Duc Industrial Park - Ba Ria - Vung Tau.

Below are some pictures of actual delivery and installation at the construction site.

The crane is bringing goods to the workshop

The number of goods is arranged to wait for input material acceptance

The number of goods is arranged to wait for input material acceptance

The number of goods is arranged to wait for input material acceptance

The number of goods is arranged to wait for input material acceptance

Image of Teacom and TVGS checking and accepting input materials

Image of Teacom and TVGS checking and accepting input materials

Image of Teacom and TVGS checking and accepting input materials

Teacom technicians are installing Busway conductor system

Teacom technicians are installing Busway conductor system

Teacom technicians are installing Busway conductor system

 

Teacom technicians are installing Busway conductor system 

 